Process
How a project runs
Predictable sequencing, documented at every stage — so the coating performs and the schedule holds.
- 1
Assessment
Site visit, asset condition survey, coating history review and adhesion testing on existing film.
- 2
Specification
Written system selection — prep standard, primer, intermediate, topcoat and target dry film thickness for the exposure.
- 3
Planning & Access
Scaffold, lift or rope access plan, staging, utilities and a schedule built around your production windows.
- 4
Containment
Shrouding, ground protection and dust or overspray control sized to the site and its neighbors.
- 5
Surface Preparation
Abrasive blasting, power tool cleaning or hydro wash to the specified SSPC standard, with profile verification.
- 6
Application
Spray, roll or brush application within manufacturer recirculation, temperature and humidity windows.
- 7
Inspection & Closeout
DFT readings, holiday and adhesion testing, punch walk, demobilization and a written report package.
Next Step
Ready to spec your next coating project?
Send drawings, tank data or a site address and we will return a scope, surface prep standard and coating system recommendation.

